Truss types: start with the space and load path
Roof shapes and room layouts help frame the conversation. The manufacturer’s engineered design determines what can actually be built.
Advertise here: ad spots and featured listings from $99/month
Roof and floor trusses do different jobs
A roof truss is part of a roof system; a floor truss supports a floor assembly. Both transfer loads to specified bearing locations. A roof shape alone does not describe the design loads, lumber grades, connector plates or permanent restraint. Bring the building plans and the intended use of the space to the component manufacturer. For a floor, identify partitions, finishes, equipment and service openings before design. An open web can offer routing space, but an opening is not permission to remove a web or to put a pipe through any convenient location. Coordinate mechanical systems with the designer instead of planning field cuts.
Sources: Truss Plate Institute: standards and ANSI/TPI 1 · Structural Building Components Association: Building Component Safety Information (BCSI)
Attic and scissor configurations
An attic truss can form part of a usable roof-space layout when designed for that purpose. The floor area, required headroom, stair access, insulation and intended occupancy need to be coordinated with the building designer. Do not assume that a storage area can become a habitable room without review. A scissor configuration can create a sloping ceiling. Its geometry still needs to fit the building’s bearing, connection and performance requirements. Show the desired ceiling shape in the architectural drawings; a sketch or photograph is a starting point for discussion, not an approved structural detail.
Gable, hip and girder components
Gable-end components, hip-roof sets and girders have distinct functions within a coordinated roof package. A girder may carry reactions from other trusses. Its bearing and connections therefore require particular coordination with the supporting structure. A gable-end component is not automatically interchangeable with an interior truss. Ask the supplier to explain the placement diagram, identification marks and any special components before delivery. The building designer and installer need to understand how the individual drawings connect to the whole building, including uplift connections and permanent bracing responsibilities.
Sources: Structural Building Components Association: Building Component Safety Information (BCSI) · Truss Plate Institute: standards and ANSI/TPI 1
Select a package, not an isolated shape
Give competing suppliers the same plan revision and ask what their packages include: design documents, layout, connectors, delivery, unloading and any erection support. A truss type is not a span guarantee or a universal price category. Span, spacing, pitch, bearing, loads, building use and architectural complexity all influence the design. If the design changes after approval, return the revision to the manufacturer before work proceeds. Keep the current placement diagram with the engineered drawings so a crew does not install a component using a superseded layout. Start with the ordering guide, then confirm permit requirements before committing to production.
Sources: Structural Building Components Association: Building Component Safety Information (BCSI) · Truss Plate Institute: standards and ANSI/TPI 1