BUILD WITH BETTER INFORMATION
How ordering trusses works
Move from a consistent plan set to coordinated drawings, production, delivery and inspection. Confirm each responsibility before releasing the package.
Advertise here: ad spots and featured listings from $99/month
Start with plans and the project location
Send the manufacturer a current, complete set of architectural and structural plans. Identify the project address, building use, roof shape, floor arrangement and any changes not yet shown in the drawings. Ask the building designer to communicate the applicable design criteria and bearing information. A conceptual quote based on incomplete plans should be understood as preliminary. Do not treat a preliminary layout as a production authorization. Keep a revision register so the builder, designer, supplier and permit reviewer are talking about the same building.
Sources: Truss Plate Institute: standards and ANSI/TPI 1 · Structural Building Components Association: Building Component Safety Information (BCSI)
Review the layout and engineered drawings
The placement diagram helps identify where components belong; individual truss design drawings describe the designed components. Coordinate them with the building design rather than treating one document as a substitute for the other. Ask who reviews reactions, bearings, connections, bracing responsibilities and conflicts with equipment or services. Resolve discrepancies before production. Where required by the authority having jurisdiction, obtain the appropriate signed or sealed documents. The manufacturer’s engineered drawings and local building department approval remain necessary; this educational guide cannot establish the permit package for your project.
Sources: Truss Plate Institute: standards and ANSI/TPI 1 · International Code Council: adopted model codes and code resources
Confirm commercial scope and production release
Request a written scope describing the components, engineering documents, included hardware, delivery destination and exclusions. Confirm who authorizes changes and who pays for a revised design or remanufacture. Ask for the supplier’s actual drawing, review and production milestones rather than relying on a generic lead-time claim. Record the acceptance process and the point at which the order is released to fabrication. If the building plans change, communicate the change through the agreed process before the crew attempts a field workaround. A revised drawing needs to reach everyone using the earlier version.
Sources: Structural Building Components Association: Building Component Safety Information (BCSI) · Truss Plate Institute: standards and ANSI/TPI 1
Plan delivery before the truck arrives
Discuss access, turning space, overhead obstructions, unloading equipment, delivery order and the storage area with the supplier and site supervisor. Establish who receives the load and compares identification marks with the delivery documents. Inspect for apparent damage and discrepancies, then report them promptly to the manufacturer. Keep the supplied handling and bracing information available to the installation crew. Storage, lifting and erection require project-specific planning and trained supervision. Arrange inspections and retain approved drawings on site. Do not load an incomplete or unbraced assembly because delivery has arrived earlier than expected.
Sources: Structural Building Components Association: Building Component Safety Information (BCSI) · OSHA: Fall Protection in Residential Construction