Handling, storage and bracing: plan before delivery

These are orientation points for planning and questions. Use current BCSI guidance, the manufacturer’s instructions, engineered documents and a competent installation team.

Advertise here: ad spots and featured listings from $99/month

Assign responsibility before delivery

Identify the site supervisor, installer, lifting-equipment provider and people responsible for temporary and permanent bracing design. Review the manufacturer’s handling information and applicable BCSI material before work starts. A successful delivery is not proof that the site is ready for erection. Discuss access, overhead hazards, exclusion areas and the equipment required for the actual load. The general information on this page is not a lifting plan or a bracing design, and it should never be used to choose attachment points, member sizes or spacing.

Sources: Structural Building Components Association: Building Component Safety Information (BCSI) · OSHA: Fall Protection in Residential Construction

Receive and protect the components

Compare the shipment with the order and placement information. Check identification marks and report apparent damage, missing items or mismatches to the manufacturer. Follow the supplier’s instructions for support, stacking, weather protection and storage orientation. Plan a storage area that avoids accidental impact, unintended loading and interference with other trades. Do not assume that a package can be stored anywhere a delivery truck can reach. If components become damaged or distorted, seek the manufacturer’s direction before installation. Keep the inspection and communication record with the project documents.

Sources: Structural Building Components Association: Building Component Safety Information (BCSI)

Temporary restraint and permanent bracing serve different stages

An assembly must remain stable during erection as well as in the completed building. Temporary installation restraint and bracing are not interchangeable with the permanent building bracing system. Follow the responsible design documents and installation guidance for the actual configuration. Do not improvise a spacing schedule from a photograph or another job. Installation can expose workers to falls and unstable components; apply the applicable OSHA requirements and the site’s fall-protection plan. No paragraph on this site replaces trained supervision, an engineered requirement or the equipment manufacturer’s instructions.

Sources: Structural Building Components Association: Building Component Safety Information (BCSI) · OSHA: Fall Protection in Residential Construction

Keep changes and loading under control

Avoid placing construction materials or equipment on an incomplete system without the responsible designer’s authorization. Never cut, drill, remove or alter truss members or connector plates to resolve a service conflict. Report the issue and obtain an approved repair or alteration detail. Make sure that the crew receives the current instructions and that required inspections occur at the appropriate stage. Before concealing work, resolve missing connections, bracing and documentation through the site’s inspection process. Truss design, bracing and permits require the manufacturer’s engineered drawings and local building department approval; installation safety also requires competent site planning.

Sources: Structural Building Components Association: Building Component Safety Information (BCSI) · Truss Plate Institute: standards and ANSI/TPI 1 · OSHA: Fall Protection in Residential Construction